Dirving in Bhutan was an adventure in and of itself. This is the part of the road that is under construction. It is also the only road between the two major cities and was created by blasting into the rock on the side of the mountain. Three times a day the traffic is stopped for 2 hours so that work crews can continue blasting. All travel has to be timed around the blasting schedule.